![]() The team wrapped the perimeter from the seventh level to the top of the 308-ft-high building, which is crowned by a goddess statue, for a total of 750,000 sq ft. "The schedule for this size project was very aggressive, with all work requiring completion within a six-month time frame."īetco employed a ring system for the scaffolding, beginning at the copper-topped roof below the circular dome. "The system had to be designed as a free-standing, self-supporting scaffold and provide access to all crafts to perform their scope of work," says Ben Cantu, vice president-operations for Betco. ![]() Critical to the success of the $3.5-million Texas State Capitol Dome & Roof Repairs & Repainting project, Betco Scaffolds, Austin, Texas, provided an intricate scaffold system under a $544,755 contract with Flintco, the Austin-based general contractor.